Notwithstanding any other provisions of this chapter, where a parcel of land contains one acre or more and all or substantially all of the surface is unavailable for the location of a geothermal well and directional drilling is found by the supervisor to be necessary, the supervisor may approve proposals to drill wells at whatever locations the supervisor determines to be advisable for the purpose of properly developing the geothermal resources except, that no well shall be drilled or permitted to produce which is located within 25 feet of the outer boundary of the parcel of land on which the well is situated or within 25 feet of a public road, street, or
highway dedicated prior to the commencement of drilling. The supervisor may require, at the time the supervisor gives approval of the notice of intention to drill, redrill, or deepen such well, that a subsurface directional survey be made, and that the survey be filed with the supervisor within 15 days of cessation of drilling operations.
3700
3701
3702
3703
3703.1
3704
3705
3706
3707
3708
3709
3710
3711
3712
3714
3714.5
3715
3715.5
3716
3717
3718
3719
3720
3721
3722
3723
3723.5
3724
3724.1
3724.2
3724.3
3724.4
3724.5
3724.6
3724.32
3724.35
3725
3725.5
3726
3728
3728.5
3729
3730
3731
3732
3733
3734
3735
3736
3737
3739
3740
3741
3742.2
3743
3744
3745
3746
3747
3748
3749
3750
3751
3752
3753
3754
3754.5
3755
3756
3757
3757.1
3757.2
3758
3759
3760
3761
3762
3763
3764
3765
3766
3767
3768
3769
3770
3771
3772
3772.2
3772.4
3772.6
3773
3774
3775
3776
3701
3702
3703
3703.1
3704
3705
3706
3707
3708
3709
3710
3711
3712
3714
3714.5
3715
3715.5
3716
3717
3718
3719
3720
3721
3722
3723
3723.5
3724
3724.1
3724.2
3724.3
3724.4
3724.5
3724.6
3724.32
3724.35
3725
3725.5
3726
3728
3728.5
3729
3730
3731
3732
3733
3734
3735
3736
3737
3739
3740
3741
3742.2
3743
3744
3745
3746
3747
3748
3749
3750
3751
3752
3753
3754
3754.5
3755
3756
3757
3757.1
3757.2
3758
3759
3760
3761
3762
3763
3764
3765
3766
3767
3768
3769
3770
3771
3772
3772.2
3772.4
3772.6
3773
3774
3775
3776